MANDATORY INSPECTIONS REQUIRED BY ONTARIO BUILDING CODE ACT

  • All Drains and vents inside a building below a concrete slab
  • Sewers outside to street line or septic tank
  • All drains, wastes, vents, showers, bathtubs and pertaining water pipe
  • Valves and fittings installed before insulation, vapour barrier, dry walling of ceilings and walls
  • Air or water test required on all piping
  • Final inspection includes the completed plumbing installation before occupancy

Call for Plumbing Inspections: 905-372-1929 or 1-800-354-7050 ext. 2226

Office Hours: 8:30 a.m. to 10:00 a.m. or leave a message anytime.
Plumbing Inspections will be completed no later than 48 hours from the day following receipt of message.

 

 

 